Start a conversation

Cut Optimise

  • Change Log for Cut Optimise

    All notable changes to this project will be documented here. In this article you will encounter the following change types: Added for new features and functionality. Changed for changes in existing fu...

  • Getting Started with Cut Optimise

    Overview Cut Optimiser (Also known as Small Batch Optimiser) assists production in optimising material cuts while reducing offcuts and waste. It can calculate the cuts required in available stock leng...

  • Introduction to the Cut Optimise Interface

    Overview Changing the schedule/Manifest view Modifying Bar Production Rules Reassigning work to different production areas Creating a cut sheet - Off-Coil devices Creating a cut sheet - Shear Type dev...

  • Production Rule Refinement

    Background When a schedule is factoried and subsequently assigned tags, each schedule item is assigned a production rule, based on the product type, length, shape, and so on. This rule allocates the p...

  • Work-Load assignment with Cut Optimiser

    Moving work between Loading Bays For this example we are given the following scenario. All work is currently scheduled to be sent from Bay E Bay E's Shearline is the S1-Schnell Shearline 500 Bay E is ...

  • Automatic Rule based Site Assignment

    Using the general rebar rules, it is possible to assign work automatically to devices at different sites within system based on general production rules for the item to be made. For this to succeed th...