How to Change the Production/Lead Time

Background

In this Knowledge Base Article, we will go through the steps needed to change the Production or Lead Time for Sundry.

Before You Begin

Steps to Follow

  1. Click on the Sundries tab in the Products Application. This will open up the Sundries Information.


  2. Locate the Production Time column relating to the Sundry Code.
     

  3. Type in and change the production time related to the Sundry Code that needs changing.
    BEFORE
    AFTER